Skip to main content
CalcSummitCalcSummit
Project Calculator · Footings · Concrete Tube Forms

Sonotube Calculator

A sonotube calculator turns tube diameter, depth and count into cubic feet, bags and tubes to buy. One 12 inch tube filled 4 feet high holds 3.14 cubic feet. Eight of them need 27.65 cubic feet with 10 percent waste, which is 47 bags of 80 lb concrete.

This tool is part of our project calculators. Use it to order concrete and tube for deck, porch and fence footings. Your building department sets the size and depth.

  • Updated October 2026
  • Sources Cited
  • No Login Required
  • Free to Use
Live Calculator · Volume · Bags · Stock Tubes

Your tubes

Deck posts, piers or fence posts.

From 0 to 36 inches. Bottom of the footing goes below the frost line.

5 to 10 percent is common.

More options: stock tube length and bag price

Optional. Type your own store price.

Your concrete

Buy this many bags

47 bags of 80 lb

27.65 cu ft with 10% waste, which is 1.02 cu yd (0.78 cu m)

Concrete height per tube
48 in
One tube holds
3.14 cu ft
Per foot of tube
0.785 cu ft
All tubes, no waste
25.13 cu ft
Bags per tube, rounded up
6
Bags if each tube is rounded
48

Bags by size

Bags needed for each bag size, including waste.
BagYieldBags
40 lb0.3 cu ft93
50 lb0.375 cu ft74
60 lb0.45 cu ft62
80 lb0.6 cu ft47
90 lb0.675 cu ft41

Tubes to buy

Stock tubes to buy for 4, 8 and 12 foot stock, cut to 4 feet each.
StockPer stock tubeBuyLeft over
4 ft180 ft
8 ft240 ft
12 ft334 ft

Each tube is cut to 4 ft. A tube longer than the stock length is not listed.

Five bag sizes

40, 50, 60, 80 and 90 lb bags, using the yields printed on the bag.

Stock tube plan

4, 8 and 12 foot tubes, with the cut pieces and what is left.

Per tube or pooled

See the count for one tube and for the whole job.

Estimates are for ordering. Holes are rarely perfect, so keep the waste allowance. Prices are never built in. You type them.

Advertisement

How to calculate concrete for a Sonotube

A tube is a cylinder. Cubic feet equal 3.1416 x (diameter in inches / 24) squared x height in feet. A 12 inch tube holds 0.785 cubic feet per foot of height. Filled 4 feet high it holds 3.14. Divide by the bag yield and round up to get bags.

  1. Pick the tube diameter. Measure the inside diameter if you use a custom size.
  2. Add the depth below grade to the height above grade. That is the fill height.
  3. Multiply the circle area by the fill height to get cubic feet for one tube.
  4. Multiply by the tube count, then by one plus the waste.
  5. Divide by the bag yield and round up. An 80 lb bag yields 0.60 cubic feet.

For a slab or a wide footing, use our concrete calculator. For bag counts on any shape, use the concrete bag calculator.

Worked example: eight 12 inch footing tubes

A deck has eight posts. Each tube is 12 inches wide, goes 42 inches below grade and stands 6 inches above. Fill height is 48 inches, or 4 feet. One tube holds 3.14 cubic feet. Eight hold 25.13. With 10 percent waste the order is 27.65 cubic feet, or 1.02 cubic yards.

Step by step concrete quantity for eight 12 inch tubes filled 4 feet high.
StepWorkingResult
Fill height42 + 6 in48 in = 4 ft
One tube3.1416 x 0.5 x 0.5 x 43.14 cu ft
Eight tubes3.14 x 825.13 cu ft
Waste, 10%25.13 x 1.1027.65 cu ft
Cubic yards27.65 / 271.02 cu yd
Bags of 80 lb27.65 / 0.60, rounded up47 bags

Check the post count against your deck plan with our deck calculator.

Concrete per foot by tube diameter

Volume grows with the square of the diameter. A 12 inch tube holds 0.785 cubic feet per foot. A 24 inch tube holds 3.142, four times as much. Multiply the figure in the table by your fill height in feet.

Bar chart of cubic feet of concrete per foot of tube for 6 to 18 inch diameters.
Figure B. Cubic feet per foot of tube height, 6 to 18 inch tubes.
Cubic feet of concrete per foot of height for common tube diameters, with the Sonoco published figure where one exists.
DiameterCu ft per foot, computedSonoco published
6 in0.1960.20
8 in0.3490.35
10 in0.5450.55
12 in0.7850.80
14 in1.069Not listed
16 in1.396Not listed
18 in1.767Not listed
24 in3.142Not listed
30 in4.909Not listed
36 in7.069Not listed

Sonoco rounds its figures to two decimals, so its 6 inch value is 0.20 where the exact value is 0.196.

Bags per tube, checked against QUIKRETE

The table gives bags to fill one tube with no waste, rounded up. A 12 inch tube filled 4 feet high takes 6 bags of 80 lb or 7 bags of 60 lb. An 8 inch tube filled 4 feet takes 3 bags of 80 lb or 4 of 60 lb.

Bar chart of 60 lb and 80 lb bags needed for a 4 foot tube in 6, 8, 10 and 12 inch diameters.
Figure C. Bags to fill one 4 foot tube, 60 lb and 80 lb bags.
Bags of 80 lb concrete to fill one tube, by diameter and fill height.
80 lb bags1 ft2 ft3 ft4 ft
6 in tube1112
8 in tube1223
10 in tube1234
12 in tube2346
Bags of 60 lb concrete to fill one tube, by diameter and fill height.
60 lb bags1 ft2 ft3 ft4 ft
6 in tube1122
8 in tube1234
10 in tube2345
12 in tube2467

These counts follow the yields printed on the bag: 0.45 cubic feet for 60 lb and 0.60 for 80 lb. Read the bag you buy, since yields differ by brand and mix.

How deep to dig and how long to cut the tube

The footing bottom must sit 12 inches below undisturbed grade and below the local frost line, whichever is deeper, per IRC R403.1.4 as cited by the Home Depot footing guide. Cut the tube to the depth below grade plus the height you want above grade. Your local code decides the final number.

Approximate frost depth by region.
RegionApproximate frost depth
Northern New England and the Dakotas60 inches or more
Upper Midwest42 to 48 inches
Mid-Atlantic24 to 26 inches
Gulf South0 inches

These depths are approximate. Ask your building department for the frost depth at your address. For fence posts, see our fence calculator.

Stock tubes: 4, 8 or 12 foot

Sonoco sells Builder's Tube in stock lengths of 4, 8 and 12 feet, cut to fit. Eight tubes of 4 feet need 8 four-foot tubes, 4 eight-foot tubes or 3 twelve-foot tubes. The longer sizes leave scrap, so compare the leftover before you buy.

Stock tubes to buy for eight tubes cut 4 feet long.
Stock lengthPieces per stock tubeStock tubes to buyLeftover
4 ft180 ft
8 ft240 ft
12 ft334 ft

Round per tube or round the total

Rounding one tube up and multiplying gives 48 bags. Pooling all the concrete and rounding once gives 47. Pooled is the better order when you mix bags from one pile. Per tube suits a job where each footing is poured as its own batch with no leftover carried over.

The calculator shows both counts so you can pick. Bags left over from one pour can go into the next tube only if the mix is still workable.

Sonotube calculator or concrete calculator

Use this page for round tubes. It adds tube diameter, depth below grade, stock lengths and a per-tube bag count. Use the concrete calculator for slabs, walls and square footings. The cylinder math is the same, but the inputs and outputs differ.

For a block wall base, see the retaining wall calculator. For steel in a footing, use the rebar calculator.

What this calculator does not cover

It does not size a footing. Load, soil and code set the diameter and depth. It does not include rebar, anchors, bolts, bell footings or the soil removed from the hole. It uses only the price you type. Ask your building department or a deck designer before you dig, and consult your supplier on bag yield.

Methodology and sources

Published October 2026. Last updated October 2026. Next review October 2027.

Alex Rivera, PE, PE — CalcSummit expert reviewer

Reviews: volume calculators · 38 calculators reviewed

Alex Rivera is a Licensed Professional Engineer (PE) with 18 years of structural and civil engineering experience. He holds PE licenses in California (#C-89412) and Texas (#P.E.-98765). He previously served as Engineer of Record on 250+ residential foundation designs at Thornton Tomasetti. At CalcSummit, he writes and personally reviews every structural, concrete, rebar, deck, and framing calculator against current IRC and ACI 318 standards.

Full profile →

Frequently asked questions

Advertisement

Advertisement