Labor Cost Calculator for Construction

Labor cost equals crew size times hours times hourly wage, plus burden. Three carpenters at the May 2025 BLS median of $29.12 an hour, working 8 hours a day for 5 days, cost $3,494.40 in wages and $4,368.00 with a 25% burden. Burden and markup are your own inputs.

This tool is part of our construction cost calculators. Need the schedule too? Try the construction timeline calculator.

  • Updated November 2026
  • Sources Cited
  • No Login Required
  • Free to Use
Live Calculator · Crew · Burden · Markup

Calculate Labor Cost

Enter the crew, the hours and the wage. Burden and markup start at 0.

Wage before burden. Valid range: $0.01 to $1,000.

Burden is payroll taxes, insurance and benefits on top of wages. Use your own payroll figure. The 25% shown is an example, not a benchmark.

Your labor cost

Labor cost with burden

$4,368.00

120 crew hours at $36.40 an hour with burden. That is $4.37 per sq ft.

Labor cost broken into base wages, burden and markup.
LineAmount
Base wages$3,494.40
Burden$873.60
Labor cost$4,368.00
Markup$0.00
Billable labor$4,368.00

Same hours, different crew size

Days needed for the same crew hours at each crew size.
Crew sizeDaysLabor cost
115$4,368.00
27.5$4,368.00
35$4,368.00
43.8$4,368.00
53$4,368.00
62.5$4,368.00
81.9$4,368.00
101.5$4,368.00

The table holds total crew hours fixed. Real crews lose time to coordination and waiting, so the cost is not always flat. The tool does not model that.

Crew and hours

Crew hours drive the cost. Days follow from crew size.

Your burden and markup

No made-up defaults. You enter your own rates.

BLS wage presets

Start from the May 2025 median wage, then edit it.

A planning estimate, not a bid. Comparing quotes? Try the contractor comparison calculator.

Advertisement

How to Read the Result

The large number is labor cost with burden. It is base wages plus the burden percentage you entered. Markup is added after that to give billable labor, the figure you would put in a bid. Cost per unit appears when you enter a quantity.

  • Crew hours are crew size times hours a day times days.
  • The loaded hourly rate is the wage times one plus the burden rate.
  • The crew size table keeps crew hours fixed and shows how many days each crew needs.
  • Materials, equipment and permits are not in the number.

For the full build budget, use the construction cost calculator.

How the Labor Cost Calculator Works

The calculator multiplies crew hours by the hourly wage, adds burden as a percentage of those wages, then adds markup as a percentage of labor cost. Each step is one multiplication, so you can check the result by hand. Nothing is hidden in a default rate.

Crew hours and wages

Crew hours are workers times hours a day times days. Base wages are crew hours times the hourly wage. The wage presets use the U.S. Bureau of Labor Statistics median for May 2025. You can overwrite them with your own rate.

Stacked bar of the example: $3,494.40 base wages, $873.60 burden and $436.80 markup.
Figure B. Wages, burden and markup in the example. The 25% burden and 10% markup are example inputs.

Burden

Burden is what you pay on top of wages, such as payroll taxes, workers' compensation insurance and benefits. It differs by employer and state. This page found no single sourced rate, so the tool starts at 0%. Ask your payroll provider or accountant for yours.

Markup

Markup covers overhead and profit when you bill labor to a client. It is a percentage of labor cost with burden. Leave it at 0% to see your cost. Add a percentage to see a billable figure. Compare bids with the contractor comparison calculator.

Cost per unit

Enter a quantity and a unit, such as 1,000 sq ft, and the tool divides billable labor by it. Size the quantity first with an area tool such as the drywall calculator or the framing calculator.

Labor Cost Example with Real Numbers

Three carpenters work 8 hours a day for 5 days at $29.12 an hour, the BLS median for May 2025. That is 120 crew hours and $3,494.40 in wages. With a 25% burden the labor cost is $4,368.00. The burden and the markup below are example inputs, not benchmarks.

Step by step labor cost for three carpenters over five days.
LineCalculationResult
Crew hours3 workers x 8 hours x 5 days120 hours
Base wages120 hours x $29.12$3,494.40
Burden$3,494.40 x 25%$873.60
Labor cost$3,494.40 + $873.60$4,368.00
Loaded hourly rate$29.12 x 1.25$36.40
Markup at 10%$4,368.00 x 10%$436.80
Billable labor$4,368.00 + $436.80$4,804.80

Spread over 1,000 sq ft, labor with burden is $4.37 per sq ft, and billable labor at 10% markup is $4.80 per sq ft. Swap in the laborer median of $22.44 and the same crew costs $3,366.00 with the same 25% burden.

Crew Size and Days

A bigger crew finishes the same crew hours in fewer days. The example job is 120 crew hours. One worker needs 15 days of 8 hours, three workers need 5, and ten workers need 1.5. The wage cost stays $4,368.00 in this simple model.

Days needed for 120 crew hours at each crew size.
Crew sizeDays of 8 hoursWorkdays to bookLabor cost
11515$4,368.00
27.58$4,368.00
355$4,368.00
43.84$4,368.00
533$4,368.00
62.53$4,368.00
81.92$4,368.00
101.52$4,368.00
Bars of days needed for 120 crew hours: 15 days with one worker down to 1.5 days with ten.
Figure C. Days needed for 120 crew hours at each crew size, 8 hours a day.

This is arithmetic, not a productivity study. A crowded site loses time to waiting and handoffs, and some tasks cannot be split. To see how days turn into a finish date, use the construction timeline calculator.

Reference Wages From BLS

The U.S. Bureau of Labor Statistics reports median pay of $29.12 an hour for carpenters and $22.44 an hour for construction laborers and helpers, for May 2025. These are what workers are paid. They do not include burden, and they are not billing rates.

Median pay from the Occupational Outlook Handbook, May 2025.
OccupationMedian per hourMedian per year
Carpenters$29.12$60,580
Construction laborers and helpers$22.44$46,680

Source: U.S. Bureau of Labor Statistics, Occupational Outlook Handbook, pages for carpenters and for construction laborers and helpers, read November 2026. Wages for other trades, such as electricians and plumbers, are not listed because this page did not read them. Enter your own rate for those.

Common Labor Estimating Mistakes

The usual errors are pricing at the wage alone, forgetting burden, and treating cost and price as the same thing. Each one makes a bid look better than it is, so check them before you send a number.

  • Using the wage as the cost. Burden sits on top of every hour paid.
  • Using a median wage as your own rate. Your crew may be paid more or less.
  • Skipping markup when you bill, so overhead and profit come out of your pocket.
  • Counting only productive hours. Travel, setup and cleanup are paid time.
  • Assuming a bigger crew always saves money. It saves days, and may add coordination time.
  • Leaving out the schedule. Labor days feed the construction timeline calculator.

Contractor's Note

Ask each bidder for labor hours, the hourly rate and the markup as separate lines. Put them next to this estimate. If a bid shows far fewer hours than your crew hours, ask what is left out. If it shows far more, ask what the extra hours cover.

Frequently Asked Questions

Advertisement

Sources and Review

Published November 2026. Last updated November 2026. Next review May 2027. This tool gives a planning estimate, not a bid. Confirm wages, burden and insurance with a licensed contractor, your payroll provider or an accountant before you quote a job.

Sarah Kim, CPE, CPE — CalcSummit expert reviewer

Reviews: cost calculators · 24 calculators reviewed

Sarah Kim is a Certified Professional Estimator (CPE) with 15 years of construction cost estimation experience. She holds CPE certification from ASPE (member #20-4891). At Turner Construction, she managed material cost analysis on commercial projects ranging from $2M to $45M. At CalcSummit, she writes and verifies all cost estimation and interior finish calculators, updating regional cost benchmarks quarterly using RS Means-informed data.

Full profile →
Advertisement