On this page
You've finally decided to tackle those crumbling mortar joints, and you're standing in the masonry aisle staring at a wall of 80-pound bags. How many do you actually need? Buy too few, and you're making a second trip with half a wall left to go. Buy too many, and you're stuck with heavy bags in the garage for years.
Short answer
Plan on one 80-pound bag of premixed mortar for every 35 to 40 square feet of brick wall. That figure assumes typical joints, around 3/8 to 5/8 inch wide, raked out about 3/4 inch deep. If your joints are wider, you'll want closer to one bag for every 20 to 25 square feet. These numbers are for repointing, where you only refill raked-out joints. Laying new brick uses more mortar per square foot, so use a brick calculator for that.
That might be all you need to get started. But if your wall isn't quite typical, or you're curious where those numbers come from, it's worth taking a few minutes to run the math yourself. Don't worry, it's simpler than it sounds.
What Determines How Much Mortar Your Wall Will Use
Four main factors decide how much mortar a repointing job will eat up.
- The size of your brick, since smaller bricks mean more joints per square foot.
- How wide those joints are.
- How deep you rake them out before filling them back in.
- How tidy you are with a trowel, since mortar that gets dropped, scraped off, or left to stiffen still counts toward your total.
The fourth might surprise you. It sounds like a throwaway point, but it ends up making a bigger difference than you'd think, as the section on planning for extra shows.
How to Calculate the Mortar for Your Project
You only need two facts to get started. An 80-pound bag of premix makes roughly 0.7 cubic feet of wet mortar. And on a wall of standard-size brick with 3/8-inch joints, about 18% of the surface you see is actually mortar, while the rest is brick.
From there, the formula is straightforward. First, find your wall area by multiplying the height by the length, then subtract any windows and doors.
Wall area = height × length − openings
Next, multiply that wall area by 0.18 to get your joint area.
Joint area = wall area × 0.18
Then, multiply the joint area by your rake depth in inches and divide by 12. That gives you the cubic feet of mortar you'll need.
Mortar volume (cubic feet) = joint area × (rake depth in inches ÷ 12)
Finally, divide the mortar volume by 0.7, since that's how much mortar one 80-pound bag makes.
Bags needed = mortar volume ÷ 0.7
If your wall has an odd angle or unusual shape, a square footage calculator can handle the adding up for you. And if your bricks aren't standard size or your joints are wider than 3/8 inch, plug your measurements into a brick calculator for a more accurate mortar percentage than the 18% rule of thumb.
Let's walk through it step by step on a real example: a wall that's 25 feet long and 20 feet high, with no windows, with the joints raked out 3/4 inch deep.
| Step | What you're figuring out | How to work it out | Example |
|---|---|---|---|
| 1. Measure the wall | The total surface of the wall | Multiply the length by the height, then subtract any windows and doors. | 25 ft × 20 ft = 500 sq. ft |
| 2. Find the joint area | How much of that surface is mortar, not brick | Multiply the wall area by 0.18, since joints make up about 18% of a standard brick wall. | 500 × 0.18 = 90 sq. ft |
| 3. Find the mortar volume | How much empty space you'll need to fill | Multiply the joint area by your rake depth in inches (3/4 inch = 0.75), then divide by 12 to turn inches into feet | 90 × 0.75 ÷ 12 = about 5.6 cu. ft |
| 4. Count the bags | How many bags it takes to fill that space | Divide the mortar volume by 0.7, since each 80-pound bag makes about 0.7 cubic feet of mortar | 5.6 ÷ 0.7 = about 8 bags |
| 5. Check the coverage | How much wall each bag covers | Divide the wall area by the number of bags | 500 ÷ 8 = about 60 sq ft per bag |
That's about 60 square feet per bag, which sounds like a lot of coverage for a single bag of mortar.
Why You Should Plan for Nearly Double
That 60 square feet per bag only holds up on paper. On a real wall, you won't come close. Mortar has a way of disappearing. It drops off the hawk, slips out of the joint, and collects in a small pile at the base of the wall. On a warm afternoon, the last bit of a batch can stiffen up before you get to it, so it ends up in the trash.
On top of that, older walls rarely rake out to a neat, even 3/4 inch. Once you clear out the loose material, some joints turn out to be much deeper than expected.
All of that adds up, and you'll likely use one and a half to two times what the formula predicts. That's roughly where the 35 to 40 square feet per bag rule of thumb comes from.
So for that 500-square-foot wall, divide by 37.5, and you get 13 or 14 bags. Go ahead and buy 14. After all, running out with a fresh batch mixed and half the wall still to go is a frustrating way to spend an afternoon.
As a general guide for pointing brick to about 3/4 inch deep, joints between 3/8 and 5/8 inch wide will get you around 35 to 40 square feet per 80-pound bag. For wider joints, between 5/8 and 7/8 inch, expect closer to 20 to 25 square feet per bag. These are working rules of thumb, so check the yield printed on your brand's bag. Mixing your own mortar instead of using premix? The same numbers apply for the same weight of mix.
When to Call in a Professional
A garden wall or a short stretch of foundation is a perfectly reasonable DIY project. Just make sure you wear a proper respirator, since grinding out joints kicks up a cloud of silica dust, and a basic paper mask won't offer much protection.
A three-story front wall, on the other hand, is a whole different job. Between scaffolding, matching historic mortar, and local regulations, the work adds up quickly. In New York, for example, a brownstone facade often requires permits and sidewalk protection before anyone even turns on a grinder. That's a big reason so many homeowners there hand the project over to a crew that does brick pointing in NYC every day instead of juggling it all themselves.
How Much Can You Expect to Spend on Repointing
The good news is that the mortar itself is the cheap part. Fourteen bags at a typical $12 to $15 apiece will run you about $170 to $210 for that 500-square-foot wall, though prices vary by brand and store. Labor is where most of your budget will go. Raking out joints is slow, detailed work, and contractors typically charge by the square foot.
The final price depends on the height of the wall, how easy it is to access, the condition of the joints, whether the mortar needs to be color-matched, and local labor rates. Before any quotes start coming in, try running your numbers through a labor cost calculator so you'll recognize a fair price when you see one.
In the end, mortar is the one part of this project where it pays to overbuy. Measure the wall, run the numbers, and then plan on close to double. At those prices, a couple of extras cost far less than a second trip to the supply yard in the middle of the job, or a half-finished wall waiting on you until next weekend.
