Skip to main content
CalcSummitCalcSummit
Project Guide · Slab · Concrete

Concrete Slab Calculator Guide

A concrete slab needs three numbers: length, width and thickness. A 20 by 20 ft slab at 4 inches takes 4.94 cubic yards of concrete, or 5.43 with a 10% allowance. For a 4 inch slab, divide the square footage by 81 for a quick check. The gravel base under it needs 4.94 cubic yards at 4 inches.

This guide is part of our project calculators. For slab volume alone, use the concrete calculator.

  • Updated November 2026
  • Sources Cited
  • No Login Required
  • Free to Use
Live Planner · Concrete · Rebar · Base

Plan Your Concrete Slab

Enter the slab size once. The same area feeds every step below.

Valid range: 2 to 12 in for the slab, 0 to 24 in for the base.

The tool ships with no price. Type the delivered price per cubic yard from your supplier to see a material cost.

Your slab quantities

Concrete to order

5.43 cubic yards

4.94 cubic yards before the 10% allowance, over 400 sq ft. A 4 in slab uses 1.23 cubic yards per 100 sq ft.

Quantities for each step of the slab job.
StepQuantity
1. Slab area400 sq ft
2. Concrete with allowance5.43 cubic yards
3. Rebar #4 grid, with allowance660 ft (15 + 15 bars)
4. Gravel base with allowance5.43 cubic yards
6. 80 lb bags, if mixed by hand245 bags

Rebar weight is about 401 lb before allowance. Forms, labor, finishing and delivery are not in the number.

One size, every step

Enter length and width once. Yards, rebar and base follow.

Slab and base

Both layers in one result, each with an allowance.

Your price, not ours

No built-in price. Type your quote to see a cost.

A planning estimate, not a bid. Need only the slab volume? Use the concrete calculator.

Advertisement

How Much Concrete Does a Slab Need?

Concrete is sold by the cubic yard. Cubic yards equal area times slab thickness in feet, divided by 27. A 20 by 20 ft slab at 4 inches needs 4.94 cubic yards. Order about 10% more for waste, which gives 5.43 cubic yards.

Step by step quantities for a 20 by 20 ft slab.
LineCalculationResult
Area20 ft x 20 ft400 sq ft
Volume at 4 in400 sq ft x 4 / 12133.33 cu ft
Concrete133.33 cu ft / 274.94 cu yd
Order with 10% allowance4.94 x 1.105.43 cu yd
Gravel base at 4 in400 sq ft x 4 / 12 / 274.94 cu yd
Base with 10% allowance4.94 x 1.105.43 cu yd
Rebar #4 at 18 in15 bars x 20 ft + 15 bars x 20 ft600 ft

Cubic yards per 100 sq ft

A 4 inch slab uses 1.23 cubic yards per 100 sq ft. A 5 inch slab uses 1.54. A 6 inch slab uses 1.85. Use these figures to check a supplier's quote.

Bars of cubic yards of concrete per 100 square feet: 1.23 at 4 inches, 1.54 at 5 inches, 1.85 at 6 inches.
Figure B. Cubic yards of concrete per 100 sq ft at 4, 5 and 6 inches.

The divide-by-81 rule

For a 4 inch slab, cubic yards equal the area divided by 81. The factor comes from the formula: 4 / 12 / 27 = 1 / 81. The 400 sq ft example gives 400 / 81 = 4.94 cubic yards. The shortcut works only at 4 inches. For other thicknesses use the table below or the planner.

Yards and bags for sample sizes

Concrete cubic yards and 80 lb bags at 4 inches for five sample slab sizes.
SizeAreaYards at 4 inWith 10% allowance80 lb bags with allowance
10 x 10 ft100 sq ft1.231.3662
12 x 12 ft144 sq ft1.781.9688
20 x 20 ft400 sq ft4.945.43245
20 x 30 ft600 sq ft7.418.15367
30 x 40 ft1,200 sq ft14.8116.30734

For other slab shapes, footings and walls, use the full concrete calculator.

The Six Steps in Order

A concrete slab job runs in six steps. Measure the area, then size the concrete, the rebar grid and the gravel base. Count bags next if you mix by hand. Check the cost last. Each step uses the area from step 1, so measure once and carry the number forward.

  1. Step 1: Square Footage Calculator

    Slab area. This guide's example is 400 sq ft. Every later quantity is built on it.

  2. Step 2: Concrete Calculator

    Cubic yards for the slab. The example needs 4.94 cubic yards at 4 inches, or 5.43 with a 10% allowance.

  3. Step 3: Rebar Calculator

    The rebar grid. #4 bars at 18 inches on center come to 600 linear feet for the example.

  4. Step 4: Gravel Calculator

    Compacted gravel under the slab. A 4 inch base under the example is 4.94 cubic yards before allowance.

  5. Step 5: Concrete Bag Calculator

    Bag count for do-it-yourself mix or a small fill. The example would need 245 bags of 80 lb mix with allowance.

  6. Step 6: Concrete Cost Calculator

    Optional. Cost of ready-mix delivery against mixing bags yourself. Use it once you know the yards from step 2.

Six steps of the slab job with the quantities for a 400 sq ft slab.
Figure C. The six steps with quantities for the 20 by 20 ft example.

Gravel Base Under the Slab

The CalcSummit project journey for a slab specifies a 4 inch compacted gravel base under every concrete slab. For the 20 by 20 ft example, a 4 inch base is 4.94 cubic yards, or 5.43 with a 10% allowance.

  • Size other base depths with the gravel calculator.
  • The planner uses one base depth for the whole slab. For a deeper base, raise the depth and the volume follows.

How Thick Should a Concrete Slab Be?

The CalcSummit project journey data lists 4 to 6 inches for a residential slab. Thickness changes the order directly, so the table shows each step for the 20 by 20 ft example. Strength matters too.

Concrete cubic yards for the 20 by 20 ft example at 4, 5 and 6 inches.
Slab thicknessYards per 100 sq ftYards for 400 sq ftWith 10% allowance
4 in1.234.945.43
5 in1.546.176.79
6 in1.857.418.15
Concrete strength for slabs, as stated on the CalcSummit Concrete Calculator page.
Slab typeStrength stated
Residential slab or patio3,000 psi minimum
Garage floor slab3,500 psi (ACI 302.1R)

These strengths come from the CalcSummit Concrete Calculator page. That page cites ACI 302.1R for the garage floor figure and has not been rechecked against the primary standards for this guide. Your local code and supplier set the mix you use. Confirm it before you order.

Rebar for a Concrete Slab

The rebar calculator page on this site sizes a grid from bar size and spacing. This guide uses #4 bars at 18 inches on center in both directions. For the 20 by 20 ft example, that is 15 bars each way, 20 ft long. The total is 600 linear feet, about 401 lb.

The CalcSummit project journey marks rebar as required for structural slabs, so ask your engineer or building department whether yours needs it. Bars per direction equal the span in inches divided by the spacing, rounded up, plus one. Add an allowance for laps and cuts: 660 ft at 10%. Size other bar sizes and spacing with the rebar calculator.

Ready-Mix or Bags for a Slab

The concrete calculator page on this site says to order ready-mix above about 1.5 to 2 cubic yards. The 20 by 20 ft example needs 245 bags with a 10% allowance, which is not practical by hand. A 10 by 10 ft slab needs 62 bags with allowance, so bags can work there.

Bags also help for a step or a repair next to a ready-mix pour. Count them with the concrete bag calculator. The planner counts 80 lb bags at 0.60 cubic feet each, the yield used on that page.

Concrete Slab Cost

Material cost equals the cubic yards you order times the delivered price per cubic yard. Installed cost adds forms, gravel base, rebar, labor and finishing. This guide found no sourced price for a concrete slab, so the planner ships without one. Type your supplier quote into the planner to see a material cost.

  • Cost per square foot equals the full quote divided by the slab area.
  • Compare ready-mix delivery against bags with the concrete cost calculator.
  • Prices change by region and season. Get written quotes before you budget.

Questions to Ask Your Concrete Supplier

Put your quantities next to each quote before you sign. A quote that differs a lot from 5.43 cubic yards for your size needs an explanation. Ask these questions and write down the answers.

  • How many cubic yards and what slab thickness does the quote cover?
  • What strength and air content is the mix, and does it suit my climate?
  • Is there a short-load fee, and what is the truck minimum?
  • What base and rebar does the price include, and who compacts the base?
  • How long before I can walk on the slab and drive on it?

The concrete calculator page on this site says to walk on concrete after 24 to 48 hours. It says to drive on it after 7 days at normal temperatures. Confirm the timing for your mix.

Frequently Asked Questions

Advertisement

Sources and Review

Published November 2026. Last updated November 2026. Next review February 2027. This guide gives planning estimates, not a bid. Confirm thickness, strength, rebar and price with a licensed contractor or your local building department before you order.

Alex Rivera, PE, PE — CalcSummit expert reviewer

Reviews: volume calculators · 38 calculators reviewed

Alex Rivera is a Licensed Professional Engineer (PE) with 18 years of structural and civil engineering experience. He holds PE licenses in California (#C-89412) and Texas (#P.E.-98765). He previously served as Engineer of Record on 250+ residential foundation designs at Thornton Tomasetti. At CalcSummit, he writes and personally reviews every structural, concrete, rebar, deck, and framing calculator against current IRC and ACI 318 standards.

Full profile →