Building Permit Cost Calculator

A building permit fee is a flat amount, a percentage of project value, or both. Plan review, inspections and surcharges come on top. Enter your city's rates and the project value to see the total and the effective rate. The tool starts at zero because permit fees differ by city.

This tool is part of our construction cost calculators. Need crew costs too? Try the labor cost calculator.

  • Updated November 2026
  • Sources Cited
  • No Login Required
  • Free to Use
Live Calculator · Fees · Effective Rate

Estimate Permit Fees

The numbers shown are example inputs, not any city's fees. Replace them with the rates from your building department.

The construction cost your city uses. Valid range: $1 to $100,000,000.

Flat fee plus percent of value gives the permit fee. Surcharge applies to every fee line except the other flat fees. Enter 0 where a fee does not apply.

Your permit cost

Total permit cost

$839.80

That is 1.68% of the $50,000.00 project value.

Permit cost broken into fee lines.
Fee lineAmount
Permit fee$550.00
Plan review$137.50
Inspections$120.00
Other value-based fee$0.00
Surcharge$32.30
Other flat fees$0.00
Total$839.80

Same fee rules at other project values

Total permit cost and effective rate at six project values.
Project valueTotalEffective rate
$10,000$319.803.20%
$25,000$514.802.06%
$50,000$839.801.68%
$100,000$1,489.801.49%
$250,000$3,439.801.38%
$500,000$6,689.801.34%

The effective rate falls as value rises when a flat fee is a large share of the total. Real schedules can use tiers, which this tool does not model.

Every fee line

Permit fee, plan review, inspections, surcharge and extras.

Effective rate

See the total as a percent of project value.

Your city's rates

No made-up fee defaults. You enter the rates.

A planning estimate, not a quote. Your building department sets the real fee. Comparing bids? Try the contractor comparison calculator.

Advertisement

How to Read the Result

The large number is the total permit cost. It adds the permit fee, plan review, inspections, any value-based fee and the surcharge, then the other flat fees. The effective rate under it is the total divided by the project value.

  • The permit fee is the flat fee plus the percent of value, or the minimum fee if that is higher.
  • Plan review is a percent of the permit fee.
  • The surcharge applies to every fee line except the other flat fees.
  • Impact fees, design fees and contractor costs are not in the number.

For the full build budget, use the construction cost calculator.

How the Building Permit Cost Calculator Works

The calculator adds a flat fee to a percent of project value, then adds plan review, inspections and a surcharge. Each step is one multiplication, so you can check it by hand. The fee rates are your inputs because no single schedule fits every city.

Permit fee

Many offices set the fee from the estimated cost of construction. Washington, DC, for example, lists a demolition permit at $30 plus 2% of construction cost. Enter the flat fee and the percent from your own schedule. Add a minimum fee if the schedule has one.

Stacked bar of the example: $550.00 permit fee, $137.50 plan review, $120.00 inspections and $32.30 surcharge.
Figure B. Fee lines in the example. The rates are example inputs, not any city's schedule.

Plan review and inspections

Some offices charge plan review as a share of the permit fee. Others charge a fee for each inspection. Enter the percent and the count if your office lists them. Leave them at 0 if the permit fee already includes them.

Surcharges and other fees

A surcharge is a percent added to the fee lines, such as the 10% additional fee on each Washington, DC line. Use the value-based fee for a charge set as a percent of value, and the other flat fees for filing or technology fees. Time spent in review also moves your start date, so check the construction timeline calculator.

Building Permit Fee Example with Real Numbers

A $50,000 project has a $50 flat fee and 1% of value, so the permit fee is $550.00. With 25% plan review, two $60 inspections and a 4% surcharge, the total permit cost is $839.80. That is 1.68% of project value. These rates are example inputs, not a benchmark.

Step by step permit cost for a $50,000 example project.
LineCalculationResult
Permit fee$50 flat + 1% of $50,000$550.00
Plan review25% of $550.00$137.50
Inspections2 inspections x $60$120.00
Subtotal$550.00 + $137.50 + $120.00$807.50
Surcharge4% of $807.50$32.30
Total permit cost$807.50 + $32.30$839.80
Effective rate$839.80 / $50,0001.68%

A check against published fees

The same math reproduces Washington, DC's listed totals. A $33 fence permit with the 10% additional fee comes to $36.30. A $65 shed permit comes to $71.50. Both match the totals DC prints. The last two rows apply DC's published formulas to a $10,000 job. They are our calculation, not a DC quote.

Calculator results compared with Washington, DC published fees.
DC lineInputsCalculatorDC lists
Fence on private property$33 + 10% additional$36.30$36.30
New garage or shed$65 + 10% additional$71.50$71.50
Demolition, $10,000 job$30 + 2% of $10,000, + 10% additional$253.00Not listed (formula only)
Retaining wall, $10,000 job$46 per $1,000, + 10% additional$506.00Not listed (formula only)

Effective Permit Rate by Project Value

The effective rate is the total permit cost divided by project value. With a flat fee in the mix, it falls as the project grows. On the example rates it is 3.20% on a $10,000 project and 1.34% on a $500,000 project.

Total permit cost and effective rate at six project values, using the example fee rates.
Project valueTotal permit costEffective rate
$10,000$319.803.20%
$25,000$514.802.06%
$50,000$839.801.68%
$100,000$1,489.801.49%
$250,000$3,439.801.38%
$500,000$6,689.801.34%
Bars of the effective permit rate: 3.20% on a $10,000 project falling to 1.34% on a $500,000 project.
Figure C. Effective rate at six project values, using the example fee rates.

Real schedules can use tiers, where the rate changes at set value bands. This tool uses one rate, so use it per band if your schedule has tiers. The calculator above runs this table on your own inputs.

Published Fee Lines From Washington, DC

Washington, DC publishes its building permit fees line by line. Each line carries a 10% additional fee. The table copies a selection of lines. They show the shapes a fee can take: a flat amount, a percent of cost, a per-$1,000 rate and a deposit. It is one city, not a national rate.

Selected Washington, DC building permit fee lines, read November 21, 2026.
LineFeeTotal with 10% additional
Fence on private property, installation or repair$33$36.30
Garage (new) or shed (new)$65$71.50
Alteration and repair, valued under $500$33$36.30
Alteration and repair, valued $501 to $1,000$65$71.50
Swimming pool, up to 15,000 gallons$260$286.00
Demolition$30 + 2% of construction costDepends on the job
Retaining wall, tank, tower$46 per $1,000 of construction costDepends on the job
Green building fee, alteration valued $1,001 to $1 million0.13% of construction valueDepends on the job
Filing deposit, new construction and alterations50% of the assessed permit fee, not over $20,000Depends on the job
Repeat technical review, single family (rejected, revised, re-reviewed plans)$65$71.50

Source: Washington, DC Department of Buildings, Building Permit Fee Schedule, read November 21, 2026. DC also prints a line for alterations valued from $1,001 to $1 million. Its wording does not state the base clearly, so this page does not model it. Read the official page before you rely on any line.

Common Permit Budget Mistakes

The usual errors are budgeting only the headline fee and using the contract price as the project value. Another is forgetting that plan review and inspections may be separate lines. Each one makes the permit look cheaper than it is.

  • Budgeting the permit fee alone. Plan review, inspections and surcharges may sit on top.
  • Using your contract price as the value. Your office may use its own estimate of construction cost.
  • Copying another city's rate. Each office sets its own schedule.
  • Ignoring re-review. DC, for one, lists a separate fee when plans are rejected and re-reviewed.
  • Leaving the permit out of the bid. Ask each bidder to show it as its own line.
  • Forgetting time. Review takes time, so check the construction timeline calculator.

Questions to Ask the Building Department

Ask for the written fee schedule and for an estimate on your project. Then ask which lines apply. One call can turn a rough estimate into a real number, and it gives you the rates to enter in the calculator above.

  • What project value do you use, and who sets it?
  • Is the fee a flat amount, a percent of value, a tier table, or a mix?
  • Is plan review included, or billed as its own line?
  • How many inspections will my project need, and what does each cost?
  • Are there surcharges, technology fees or state fees on top?
  • What does a re-review or a permit renewal cost?

Frequently Asked Questions

Advertisement

Sources and Review

Published November 2026. Last updated November 2026. Next review February 2027. This tool gives a planning estimate, not a quote. Confirm every fee with your local building department before you budget or apply.

Sarah Kim, CPE, CPE — CalcSummit expert reviewer

Reviews: cost calculators · 24 calculators reviewed

Sarah Kim is a Certified Professional Estimator (CPE) with 15 years of construction cost estimation experience. She holds CPE certification from ASPE (member #20-4891). At Turner Construction, she managed material cost analysis on commercial projects ranging from $2M to $45M. At CalcSummit, she writes and verifies all cost estimation and interior finish calculators, updating regional cost benchmarks quarterly using RS Means-informed data.